city of Chula Vista

File #: 14-0152    Name: Wastewater Master Plan Update & Sewerage Capacity Charge Wastewater Master Plan and Sewerage Capacity
Type: Public Hearing Status: Passed
In control: City Council
On agenda: 7/8/2014 Final action: 7/8/2014
Title: CONSIDERATION OF ACCEPTING THE 2014 WASTEWATER MASTER PLAN UPDATE AND MODIFYING THE SEWER CAPACITY CHARGE AND WASTEWATER UNIT GENERATION RATES A. RESOLUTION NO. 2014-135 OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING THE 2014 WASTEWATER MASTER PLAN UPDATE B. ORDINANCE OF THE CITY OF CHULA VISTA AMENDING: CHULA VISTA MUNICIPAL CODE SECTION 13.14.090 (SEWER CAPACITY CHARGE); THE CITY'S MASTER FEE SCHEDULE (CHAPTER 12 - SEWER FEES); AND THE CITY'S SUBDIVISION MANUAL (SECTION 3-300 - SEWER DESIGN CRITERIA), TO MODIFY THE SEWER CAPACITY CHARGE AND THE WASTEWATER UNIT GENERATION RATES (FIRST READING)
Indexes: 2. Economic Vitality
Attachments: 1. Item 19 - Wastewater_Master_Plan_REPORT, 2. Item 19 - Resolution, 3. Item 19 - Ordinance, 4. Item 19 - Master Fee Schedule Section 12-100 Striked, 5. Item 19 - Master Fee Schedule Section 12-300 Striked, 6. Item 19 - Subdivision Manual striked, 7. Item 19 - Sewer Capacity Charge MC Striked, 8. Item 19 - Presentation
Related files: 14-0436
Title
CONSIDERATION OF ACCEPTING THE 2014 WASTEWATER MASTER PLAN UPDATE AND MODIFYING THE SEWER CAPACITY CHARGE AND WASTEWATER UNIT GENERATION RATES

A. RESOLUTION NO. 2014-135 OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING THE 2014 WASTEWATER MASTER PLAN UPDATE

B. ORDINANCE OF THE CITY OF CHULA VISTA AMENDING: CHULA VISTA MUNICIPAL CODE SECTION 13.14.090 (SEWER CAPACITY CHARGE); THE CITY'S MASTER FEE SCHEDULE (CHAPTER 12 - SEWER FEES); AND THE CITY'S SUBDIVISION MANUAL (SECTION 3-300 - SEWER DESIGN CRITERIA), TO MODIFY THE SEWER CAPACITY CHARGE AND THE WASTEWATER UNIT GENERATION RATES (FIRST READING)


Body
RECOMMENDED ACTION
Recommended Action
Council conduct the public hearing, adopt the resolution and place the ordinance on first reading.

Body
SUMMARY
The current Wastewater Master Plan was prepared in 2005 (2005 Study). Since that time, the City has had changes in planned development and flow projections. This 2014 Wastewater Master Plan Update (2014 Study) accounts for said impacts on the wastewater system.

The 2014 Study covers the wastewater collection, conveyance and treatment capacity requirements under existing and ultimate City build-out conditions, conducted on behalf of the City by Infrastructure Engineering Corporation, Inc.

The 2005 Study recommended that the Sewer Capacity Charge be set at $3,478 per Equivalent Dwelling Unit (EDU). The 2014 Study recommends modifying the charge to $3,450 per EDU. It also recommends modifying the single family wastewater unit generation rate from the existing 265 gallons per day (GPD) to 230 GPD. With this action, the City Council will consider:

(i) Accepting the 2014 Study;
(ii) Modifying the Sewer Capacity Charge and Wastewater Unit Generation Rates, as recommended in the 2014 Study;
(iii) Amending Chula Vista Municipal Code section 13.14.090, the City's Master Fee Schedule and the Subdivision Manual, to reflect the modifications and provide for annual increases...

Click here for full text